How to estimate a project cost
Give each item a low and high cost. If the price is fixed, use it for both. Enter your own estimate within the range when you have one.
If materials might cost 80 to 120 and labor might cost 100 to 160, the project range is 180 to 280. Using both midpoints gives an estimate of 230.