How to use the concrete calculator
- Choose Slab / footing for anything rectangular (patios, pads, driveways, footings, walls) or Column / post hole for round shapes.
- Pick your units and enter the dimensions. Slab thickness and column diameter are in inches (or cm).
- Set how many identical pieces you're pouring and the extra for waste (10% is typical).
- Order the cubic yards or metres shown, or buy the number of bags listed.
Concrete volume formulas
Slab: Volume = Length × Width × Thickness
Column: Volume = π × (Diameter ÷ 2)² × Height
Cubic yards = Cubic feet ÷ 27 · 1 cubic yard = 0.7646 m³
Example: a 10 × 10 ft patio, 4 inches thick: 10 × 10 × (4 ÷ 12) = 33.3 cu ft = 1.23 cubic yards. With 10% extra that's 1.36 cubic yards, or about 62 bags of 80 lb premix.
Typical slab thickness
| Project | Typical thickness | Concrete per 100 sq ft |
|---|---|---|
| Walkway, patio, shed base | 4 in (10 cm) | 1.23 cu yd |
| Driveway, garage floor | 5–6 in (12–15 cm) | 1.54–1.85 cu yd |
| Heavy-vehicle pad | 6–8 in (15–20 cm) | 1.85–2.47 cu yd |
Bag yields
Premixed bag yields vary slightly by brand. These typical figures are used here: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft and 40 lb ≈ 0.30 cu ft. That works out at roughly 45 bags of 80 lb per cubic yard. Check the bag you buy and adjust if needed.
Planning the whole area first? Use the square footage calculator. Painting walls too? Try the paint calculator.
Estimates only. Structural slabs, footings and walls must meet your local building code; ask your building department or an engineer about thickness, reinforcement and mix.
Frequently asked questions
Multiply length × width × thickness to get the volume, using the same unit for all three. In feet, divide cubic feet by 27 to get cubic yards. A 10 ft × 10 ft slab 4 inches (0.333 ft) thick is 10 × 10 × 0.333 = 33.3 cubic feet, or 1.23 cubic yards. Add 5–10% for waste and uneven ground.
Divide the volume in cubic feet by the yield of one bag. Typical premixed concrete yields about 0.30 cubic feet per 40 lb bag, 0.45 per 60 lb bag and 0.60 per 80 lb bag. A 33.3 cu ft slab plus 10% waste needs about 62 bags of 80 lb concrete. Check the yield printed on the bag you buy.
Bags make sense for small jobs like fence posts, steps and pads under about 1 cubic yard. For bigger pours, ready-mix delivered by truck is usually cheaper and faster, and gives a more even slab. Many suppliers have a minimum order, often around 1 cubic yard, with a short-load fee below that.
4 inches (10 cm) is standard for patios, walkways and garage floors for cars. Driveways and areas for heavier vehicles are often 5–6 inches (12–15 cm). Footings and structural slabs depend on loads and local building codes, so check with your building department or an engineer.
Most contractors add 5–10%. Uneven subgrade, spills and form bulges all use extra concrete, and running short mid-pour is much worse than having a little left over.